Skip to main content

Monitoring

Sales 24/7, call +64 275 440 760

Write a Review

Construction monitoring is required to form the PS1. Inspection for the acceptance of the foundation and excavation will commonly be one inspection. This is considered the pre pour inspection milestone. 

The steelwork erection inspection (i.e. to look at the final installation to confirm that bolt tensioning has been completed adequately) is required to complete the construction monitoring.